BRINDISI ELETRIC STATION

Cable connection Double Terna 380 kV from the Electric Station of the C.le of Brindisi Enipower to the 380 kV “C.le Brindisi Nord – Brindisi Pignicelle air power line.
The activity includes:
• construction of exploratory shafts by mini mechanical excavator;
• continuous bores with mechanical probing up to a maximum depth of 15.00 metres;
• georadar surveys.